Sample Resume for mechanical engineer or for any post of engineer it can be used for chemical engineer,plant engineer,environmental engineer,maintenance engineer etc. You can change necessary information and can use it.
Resume for Mechanical Engineer With Experience
ENGR. KALEEM AHMAD ALI
M.E Manufacturing Engg. , B.E Industrial Engg. & Management
Current Location & Permanent Address: Lahore Cantt – Pakistan
Mobile : +92-321-4311667, Email: uet.msme1007@gmail.com
Profile:
Industrial Engineer having exposure of $128 Million EPC Project of MNC Factory & have expertise in Mechanical Maintenance , Manufacturing , Project Procurement (EPC). A dedicated team player known for delivery of commitments within constraints and have excellent technical & managerial skills. Have polished computer skills in MS Office & also worked in Primavera P6, SAP, IFS & Oracle. Familiar with site based jobs work environment & also have experience of corporate environment that’s why has ability to perform efficiently under drastically changing work conditions with increasing job responsibilities.
Key Competencies
? Mechanical Maintenance Planning , Scheduling & Execution
? Mechanical Working (pneumatic lines & equipments , hydraulic presses & pumps, vessels , storage tanks, different valves etc )
? Trouble Shooting (Rotary equipments : compressors, pumps , blowers , industrial fans etc)
? Production Handling & People Deployment
? Procurement ( Forecasting , BOQ / Indentation , RFQ , PR , PO , Invoicing , Supplier Follow-up etc)
? Project Management (Planning , Execution, Coordination and Control)
? Project Estimation & Budgeting
? Quality Management Tools ( DMAIC , 5 W Analysis , Fish Bone Diagram etc )
? Excellent team leading & people management skill
? Strong commitment to deliverables
Professional Experience (5 Yrs approx.)
SS Foot Marks , Pk
Apr 2012 – Sep 2013
Worked in SS Foot Marks as Maintenance Engineer – Mechanical from April 2012 to Sep 2013. SSFM is manufacturing facility of Stylo Shoes, one of the leading brand in Pakistan having workforce more than 300 persons with the 4 semi automated production lines & having maintenance team of more than 15 people. Production machines consists of different hydraulic presses for cutting & pressing, conveyers with gear box, pumps, industrial fans, blowers, pneumatic hammers, industrial stitching m/cs , pneumatic line, air compressor, air storage tank, Genset etc. There my job domain was :
? Monitoring & Controlling Mechanical Maintenance Activities & Cost.
? Development of maintenance plans & organize routine service schedule.
? Deployment of daily routine maintenance tasks to different maintenance teams.
? Coordination with production department to avoid downtown of machines due to maintenance & accordingly set offline & online maintenance schedule.
? Restoration of Break-down maintenance issues ASAP & making of root cause analysis of failure.
? Arranging maintenance supplies & maintaining the Inventory of maintenance consumables with collaboration of purchase & store department.
? Prepared & developed maintenance SOP’s & methods keeping in view the safety element.
? Developed the drawing & layout for company Design Department new building & also supervised the Electrical cable trays & other Installation work in new building.
? User of ERP Software System ORACLE-E Business Suite PRODUCTION Module.
Millat Tractors , Pk
Feb 2011 – Apr 2012
Worked in Millat Tractors as Production Engineer in Tractor Assembly Plant from Feb 2011 to April 2012. Millat Group is one of the leading Manufacturers of Automotive & Agriculture equipments with 4 big factories in Pakistan with more than 700 vendors. Only Millat Tractors Factory consists of more than 5 different Plants having workforce more than 2000 persons, 150 Engineers & 65 mangers with land area 720,000 m². MTL is manufacturer of Diesel Engines (Perkins, UK), Fork Lifters (Heli) & Tractors (Massey Ferguson, UK).
There my job domain was :
? Looked tooling in assistance of Technical Advisor (Jigs, fixtures & presses special tools) & make modifications for better & improved quality of product.
? Calibration of different gadgets like Manual Torque Wrenches, Pneumatic Impact Wrenches & Torque Control Guns on weekly basis. If found malfunctioning or worn out then Replace & sent for repair.
? Production assembling operations monitoring & administration in alternate week day/night shifts & Manpower deployment on assembly & subassembly lines.
? Revised & update WORK INSTRUCTIONS (SOP) of the Tractor Assembly Plant (Rear axle built, Transmission case assembly, Chassis built & Final built line). Did Verification for compliance to STANDARD OPERATING PROCEDURES SOP’s in assembly operations & report non-standard practice.
? Analysis of daily minor/major rectifications & 1st PDI failure reports to identify the ROOT CAUSES OF FAULTS & give feedback to avoid future nonconformities.
? Interact with different departments like with Material Management for availability of right parts on right time at right subassembly lines & with Quality Control to remove the rejected/damaged supplies.
? Interact with Maintenance department for BREAKDOWN & SCHEDULE MAINTENANCE of production hall machines & equipments.
? Used ERP Software Industrial Financial System IFS { AUTOMOTIVE & ENTERPRISE ASSET MANAGEMNT Modules } for different concerned transactions like work order (WO) , purchase request (PR) , material issuance request (MIR) , material replacement (MR) etc
Tetra Pak , Pk
Sep 2009 – Dec 2010
Worked in Tetra Pak Pakistan as Project Engineer – Procurement form Sep 2009 to Dec 2010 in EPC project of new factory construction. Tetra Laval a Swedish group launched one of the largest Tetra Pak Plant in Middle East Region in Pakistan in December 2010. The project cost 92M € (128M $) with land area 150,000 m². The plant covered 35,000 m² area with 24000 m² concrete, 17000 m² epoxy floors, 4 km roads, 2000 tons PEB roofs, 10.7MW power plant, 220,000 liters capacity diesel storage tank, SNG & LPG plant & cooling plant. World leading contractors & consultants played their role in this Project like Siemens for Electrical & BMS, Cisco for IT & Networking, Mammut for Steel Structure, Nespak for Architecture , Habib Rafique for Civil, Tyco for Fire fighting, FnD for Mechanical. The plant implements SAP and latest integrated Building Management Systems (BMS). There my job domain was :
? As per BOQ & demands provided by different projects teams contact different Suppliers (MEP & GOS); Float RFQ, Collect Quotations, make comparative analysis & after approvals issuance of POs to suppliers & orders processing. Also ensure timely deliveries & invoices processing complete P2P Process in ERP System SAP PRODUCTION PE-1 (Purchasing module).
? Dealed with different suppliers ; concrete, cement, steel (bars, sheets, plates, pipings etc) & MEP suppliers to buy building material for new factory. Also responsible to cross check quality & quantity of the supplied building material.
? Involved in Buying Diesel (HSD) for company Power Plant & Material Handling Equipments (like cranes, lifters etc) from different OIL MARKETING COMPANIES like PSO, Total, Byco etc. Later on also led the contract signing with PSO for regular supply.
? Prepared Capital Expenditure CAPEX of different assets like Industrial Vacuum Cleaners, Air Conditioners, Large LCD TV’s etc & bought these Assets (Complete P2P Process).
? Did time to time special assignments like :
? Negotiation for agreement of 500 KVA rental generators for new factory site with Orient Energy, Pk.
? Establish new factory kitchen & routine supply. (Bought cooking & serving utensils)
? Bought Fire Fighting Equipments, Personal Protective Equipments (PPE’s) & Gardening Equipments for Factory.
? Prepared initial feasibility of installation of petrol & diesel filling station within factory (dispensers + underground tanks) for Factory Material Handling Equipment (like lifters, cranes etc) & company Pool Cars. etc
? Hiring & conversion of fork lifter into man lifter for main hall ceiling installation work to meet deadline.
Technical Qualification:
M.E MANUFACTURING ENGINEERING [ 2010 – 2012 ]
University of Engineering & Technology, Lhr, Pk
B.E INDUSTRIAL ENGINEERING & MANAGEMENT [ 2004 – 2009 ]
University of the Punjab, Lhr, Pk
Courses & Trainings: Lean Manufacturing , Manufacturing Processes, Project Management, Primavera P6, TQM, Industrial Maintenance, OHSAS 18001, ISO 9001 , EMS 14001 , Six Sigma , First Aid, Site Safety Courses etc.
Computer Skills: MS Office, SAP, Oracle, Primavera P6, Auto Cad etc.
Professional Affiliation: Pakistan Engineering Council.
References: References, attested degree & concerned documents can be provided upon req